FC Shakhtar training pitches
Shchaslyve · 2025–2026

Excavating the football pitch site and levelling the base with a laser grader.
The drainage system and its installation.
Grading the gravel layer of the football pitch to a slope.
Heating system: installing the manifolds and the heat substation.
The automatic irrigation system and its installation. Installing the pumping station.
Grading the final layer of the football pitch build-up.
Installing the hybrid surface or seeding. Applying fertilisers.
Football pitch maintenance.

Shchaslyve · 2025–2026

Kyiv · 2024, 2026

Shchaslyve · 2024–2025

Heronymivka · 2023–2024

Kryvyi Rih · 2021–2022

Koncha-Zaspa · 2021

Kyiv · 2021

Kyiv · 2021

Kyiv · 2021

Sviatoshyno · 2021

Mariupol · 2020–2021

Lviv · 2019

Lviv · 2018

Sviatoshyno · 2018

Kyiv · 2011–2012

Lviv · 2011

Kharkiv · 2011


















The cost depends on the pitch size, the type of turf (natural, hybrid or artificial) and whether drainage, undersoil heating and irrigation are needed. Tell us about your site and a manager will prepare an estimate and an offer.
Excavation and laser grading, drainage, the gravel build-up, undersoil heating and irrigation, the final build-up, turf and aftercare. Each stage is described above under «Construction stages».
Natural turf is the classic choice for stadiums and training pitches. Xtragrass hybrid turf (GreenFields) combines natural grass with synthetic fibres and copes better with heavy use — we installed it at the Lobanovskyi Dynamo Stadium and at the FC Rukh training base.
Yes. For example, at the Lobanovskyi Dynamo Stadium we removed the top layer, graded the pitch build-up, installed Xtragrass hybrid turf and seeded it.
Yes, if the pitch has undersoil heating: we install pitch heating and heat stations so the pitch can be used through the winter.
Yes. We maintain pitches and supply everything for their care: TORO, Redexim and Dennis machinery, ICL fertilisers and DLF and Barenbrug seed.
Didn’t find the answer?
Call me back