- City
- Heronymivka
- Year
- 2023–2024
- Project type
- Football
- Technologies
- Xtragrass
About the project
5 pitches: 2 with Xtragrass GreenFields hybrid surface and 3 with GreenFields artificial turf.
Work done
9 stages
- Technical supervision
- Base grading
- Drainage system
- Irrigation system and pumping station installation
- Pitch build-up grading
- Hybrid pitches: installation of Xtragrass GreenFields surface, infill, seeding, fertiliser application
- Artificial pitches: drainage, Perrot cooling system, bonding of the surface, infill and brushing
- Supply and installation of football goals on all pitches
- Supply of maintenance machinery, seed and fertilisers
Video
-
Laser grading of the base -
Irrigating the hybrid pitch -
Infilling the artificial turf